What We Do

Services

The full list of what we handle, from framing to final coat.

Home › Services

Everything we take on

Every job below is one we do ourselves across Seattle.

Deck Installation

We build new decks from the footings up, sized to span tables for your joist spacing and species of lumber. We set footings below the local frost line and have them inspected before framing continues on top. Most ground-level decks take about a week; multi-level decks with stairs run longer.

Deck Repair

We fix sagging joists, rotted ledger boards, and stairs that have started to pull away from the house. Sometimes it's one bad board, sometimes the whole frame needs sistering with new lumber. We'll tell you which one it is before we start cutting anything.

Deck Staining & Sealing

Cedar and pressure-treated lumber both need a fresh coat every two to three years in this climate, or the wood grays and starts to check. We pressure wash first, let the boards dry for a day or two, then apply a penetrating stain rather than a film-forming finish that'll just peel.

Custom Deck Design

We draw up decks around how your yard actually slopes, where the sun lands in July, and whether you want a grill station or built-in bench. Multi-level layouts, curved rim joists, and inset lighting all get worked out on paper before a single post goes in the ground.

Composite Decking

Composite boards like Trex or TimberTech don't need staining and don't splinter, which matters if you've got kids or dogs on the deck. We still frame underneath with real lumber or steel, because composite boards aren't structural on their own.

Deck Framing & Structural Repair

This is the part under the boards nobody sees until it fails, the joists, the beam, the post bases. We replace rusted joist hangers, add blocking where it was never installed, and resize beams that are undersized for the span they're carrying.

Deck Railing & Baluster Repair

Washington code calls for 42-inch guardrails and baluster spacing that won't pass a 4-inch sphere, and a lot of older decks don't meet either number. We rebuild to code, not just to the height that looks right from the yard.

Deck Resurfacing

If the frame underneath is still sound, we can pull the old decking and replace it without rebuilding the whole structure. It's a faster, cheaper way to get rid of cupped or splintering boards when the bones of the deck are fine.

Multi-Level Deck Construction

Sloped lots around Seattle often call for a deck that steps down in two or three levels instead of one tall platform off the back door. Each level needs its own footings and beam calculations, so framing takes longer, but the stairs between levels end up feeling like part of the yard instead of an afterthought.

Pergolas & Covered Decks

A pergola or a solid roof over part of the deck gives you somewhere dry to stand during a Seattle drizzle. We tie the structure into the existing framing or add new posts and footings, depending on what the deck can actually support.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Seattle, WA

Where this list of deck work gets done.

Seattle, WA
Bellevue, WA
Kent, WA
Everett, WA
Renton, WA
Federal Way, WA
Kirkland, WA
Auburn, WA
Redmond, WA
Sammamish, WA
Shoreline, WA
Issaquah, WA
Common Questions

Things worth asking

Questions that come up once a project gets moving.

Do I need a permit to build a deck in Seattle?
Seattle requires a permit for most decks higher than 30 inches off the ground or attached to the house. Decks under that height built freestanding sometimes avoid the permit requirement, but checking with the city before building is the safer route.
How long does a deck project take?
A straightforward ground-level deck usually takes about a week from footings to final board. A multi-level deck with stairs, railings, and a pergola can run two to four weeks depending on size and weather delays.
Can a deck be built to fit a specific budget?
Decking material and footprint size are the two biggest levers for adjusting cost, with pressure-treated lumber costing less than composite or cedar. A smaller footprint or single level instead of multi-level also brings the number down.
What kind of guarantee comes with deck work?
Workmanship is covered under warranty, and materials like composite decking carry their own manufacturer warranty separate from the installation. Specific warranty terms should be written into the contract before work starts.
Who do I talk to once the project is underway?
The same crew framing and finishing the deck is the point of contact throughout the job, rather than a separate project manager and sub. Questions about progress or changes go straight to the people doing the work.
What materials are used for decking?
Pressure-treated pine, cedar, and composite brands like Trex or TimberTech are the three most common decking materials used locally. Framing lumber is pressure-treated regardless of what decking material sits on top, since that part stays wet longer.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, though the immediate work area around the deck footprint needs to stay clear for safety and material staging. Driveway or side-yard access is often used to move lumber in rather than cutting through the main yard.
What do I need to do to prepare before the crew arrives?
Clearing furniture, planters, and grills off the existing deck or the build area is the main prep needed before work starts. Moving vehicles out of the driveway on build days also helps if lumber delivery needs that space.
What happens if you find rot or damage once the old deck is torn off?
Hidden rot in the ledger board, rim joist, or support posts gets flagged before new framing goes on top of it, since building over bad wood just hides the problem. Any additional repair cost is discussed and approved before the work continues.
How should a new deck be maintained?
Wood decking needs a fresh stain or sealant every two to three years in the Pacific Northwest to keep water from soaking into the grain. Composite decking just needs a regular wash to keep algae and pollen from building up on the surface.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (206) 429-8606